1. External Affairs
- (Cynthia & Kate) Making presentations for Chairman’s Award
 - (Izzy, Wendy, Rachel) essays written
 - next Wednesday Mr. Masik (German speakers?)
 
2. Catapult
- (Mr. Roche) transmission dog box working!
 - (Amy, Isabella, Thee, lots of people) figured out latching system
 - put it all together. may have to figure out shape
 - give some thought to limit switch & release mechanism
 
3. Chassis/Drive Train (Mr. Wells)
- (Aidan & Liam) Cut more pieces off gearboxes ==> DONE
 - (Connor & Payton & June etc.) Steering Arms
 - (June) Drag links length adjusted
 - Lock washers needed on the wheels
 - (Thayer) 2/4 wheels filled up (tire pressure thing broke. should be fixed by 1)
 - Welding still needs to happen
 
4. Ball Picker Upper (BPU)
- Lots of thinking of moving up & down
 - fixing method for the BPU to the top axle
 - Where does the motor attach to the chassis?
- talking to catapult team for space claims above the gearboxes
 
 - 1 in rollers added on bungees
 - centering issue ==> needs to be raised faster
 
5. Winch
- re-design is continuing
 - WILL BE AWESOME
 
6. Fly Wheel
- Cut made lots of holes & screwed them in
 - later today will be putting bearings in
 - SUPER CLOSE TO FINISHING
 
7. Second Bot
- All 4 tires filled up & ready to go
 - need to put the gearboxes on (need to put steering knuckles on the gearboxes)
- kingpin holes need to be drilled & threaded
 - rock wall trims should be done before gearbox is put in
 
 - still waiting on last axle for 4th gearbox
 - welding today!
 
8. Field Elements
- Not fixed yet.
 
9. Software
- Set up sonar sensor (identifying defenses)
 - lots of process for arcade drive. figuring out how PID commands work
 
