1. External Affairs
- EMC sweatshirt orders already sent out
 - Team sweatshirts orders going out soon. Please put answer (even if no)
 
2. Catapult
- built reinforcements
 - shoots low but harder
 - something broke and we have to replace
 - working on the dogbox (trying to get CIM in)
 
3. Chassis/Drive Train
- (Aiden) Cutting off parts of drive train gearboxes that hit rock wall (still in progress)
 - (Wells) Steering Box -think we’ll be going w/capstan design
- looking for parts (urethane skateboard wheels)
 
 - Welding still needs to be done
 
4. Ball Picker Upper (BPU)
- figured out that 1 motor needed
 - make mounting method / belt system for motor
 - center rollers and red rollers re-cut @ installed. need to tested
 
5. Winch
- re-designed entire design. will take a couple more days to re-build it (smaller, better, faster, stronger)
 - eventually motor will go on
 
6. Fly Wheel
- getting more gears attached & spacing
 - coming along.
 - need to laser cut spacers
 
7. Second Bot
- Have all the parts needed
- Holes need to be drilled in axle plates (use chassis punch)
 - Need to welded together
 - Make some plywood templates to get 90 degree angles
 
 - Gearboxes – 3/4 done. 4th one needs a new axle.
 - Wheels – put all the hubs on. get attached to gearboxes.
- hubs need to be turned around (no new axles need to be made)
 - air needs to be pumped in
 
 - we have a good number of heim joints (so lets not lose them)
 
8. Field Elements
- still need to put last block in rough terrain
 
9. Software
- figuring out do field sensing
 - testing out NavX system (may have to re-calibrate)
 - set up arcade drive. waiting on drive train to progress
 