Monday 3/2 Scrum Notes

  1. What did I do today?
  2. What will I do tomorrow?
  3. What’s standing in my way?

1. Raise the angle of the elevator AND/OR Lower the axis of the elevator

  • Likely to take the first 2 hours of the BAG OPENING fixing this

2. New set of Hooks

  • Hooks take a lot of time.
  • Other people should also design hooks. (Kevin doesn’t have to be the only one)

3. Second Robot

  • We have approximately 48 hours: is that really enough time to build another robot & fabricate the parts?
  • We need the DRIVETRAIN, not the ENTIRE ROBOT.
    • This can help us with the timing of the Autonomous.
    • Mecanum wheel Drivetrain would be the best, but if various things constrain us, then Kevin is good with other wheels.
    • GOAL: Finish the drivetrain by TOMORROW.

Leave a Reply