Scrum Notes 2/15/16

1. External Affairs

  • Worked on presentation. Will meet w Ms. Donavan tmrw

2. Catapult

  • FINISHED!
  • Tweaked winch idea. (for swiveling). Needs to be assembled.
  • Fits in robot
  • Need to rubber band
  • Needs testing
  • Supports and talon row is on the robot
  • Back fin should serve as hard stop for the ball to stop rolling & vomiter

3. Chassis/Drive Train (Mr. Wells)

  • Need to put in linear potentiometers
  • need to be wired
  • BPU Potentiometer needs to be wired
  • Secondary supports need to be welding
  • DO BUMPERS NEED TO GO IN BAG AND TAG?

4. Ball Picker Upper (BPU)

  • Belt keeps on jumping. Needs belt tension
  • Assembled everything over the weekend
  • Cut out stuff that touches the belt
  • Narrowing the frame. Should be done soon

5. End Game

  • Still need to assemble & figure out how to fit

6. Fly Wheel

  • made 2 more pieces. Need to get spacers & assemble

8. Software/Electronics

  • mounting stuff. Talons are in process of getting on.
  • Talon mounts all built.
  • Can start testing as soon as everything is wired

**need to document designs

**tracking spending for parts?