Day 02/16 Scrum Notes

Catapult

  • More assembly
  • Fine tuning
  • Need to make an energy absorber to attach to the catapult possible pool noodle

Flywheel

  • Put all the stuff together
  • One of the gears is off, so need to make a new piece for that
  • After that it should be done except for spacers and axles and stuff

Programming

  • wiring everything
  • need to solder everything
  • Almost done

Chinning Bar

  • Have all the pieces (big pieces) cut out
  • Still need to cut the traces into them and put them together
  • Paint it

BPU

  • Frame being cut
  • Tail gate is done
  • Needs to be reinstalled

Start testing tomorrow

Winch

  • Working on the gear box

Made a mock chairmens presentation today, went pretty well

Probably make a poster for the actual presentation and refine it

 