Notes
- Protoyping (David, Wells)
- Kicker prototype
- found our pivot points similar to catpult so plan is to run kicker and then modify for catapult 90 % kicker will be done
- Catapult (????) Not sure if work was done (Padron?)
- Wiring (Roche, Alipour David B)
- 90 % done on second upright board
- upright channel is coming
- Kevin (oir other software folks are to test)
- El Toro (wells)
- Waiting for a key way cutting tool (coming thursday)
- Gorilla Glue is adequate (good)
- Chassis Crew (Jane)
- Chassis is here!!!
- most of cutting of outside metal done
- Big day tomorrow build this now
- Need — mountings for gear boxes to chassis didnt show up ANDYMARK ISSUE
- Bumpers
- New wood square
- Design for reversable color bumpers katrina thinks they will look bad
- We dont think we can do reversable bumpers
- Software (Kevin)
- Not much done — Looking for a green light but we found a blue one,
- worked on other things, worked on installing blue light
- Vision Targets (Donald)
- found good board for flippable targes
- ETA — Now just put tape on it (could be done tomorrow)
- T-Shirt Stuff
- Have a design Victoria Putnam working on T-Shrit
- Cool Zip up warm up suits
- Shopping List
- Air conditioning unit — 🙂
- Let’s maybe order an axis camera….
- Velcro –2-3 packets with velcro tabs….
Priorities
- Prototype Thrower — main priority
Must
These will happen no matter what
- Drive
- Herd
- Score >= 6 pts
- Bumpers
- Do this first week, while prototypers prototype
- Documentation
|
Should
Prioritize, try to get to as many as possible
- Maneuverable (drive train and practice)
- Mecanum wheels
- Hold (hardware) a. with potential to shoot if that system comes online b. Loading (hardware) — might not even need this
- Shoot 8’ (hardware)
- Some aiming (software)
- Second robot for driving practice/thinkin’
|
If Time Permits
Reach goals
- Catch
- Differential power settings
- Vision system
- Modular goalie arm (sub 30 lb, replace shooter at competition)
|
Housekeeping
- Clean up after yourself
- Help teammates clean up after themselves
- We don’t leave until we scrum… we don’t scrum until the shop is clear
- Half-finished projects go on shelves, not the floor
- Scrap is only useful if it’s stock, stock is only useful if it’s organized
|
Robot Deadlines
Jan. 11: Drivetrain
Jan. 15: Mock Thrower
Jan. 18: Picker-Upper Real
Jan. 22: Vomiter I
Jan. 25: Vomiter II
Jan. 29: Gearbox
Feb. 8: Finish Mechanicals
Side Projects
Things we can do before we have a design finalized…
|