- What did I do today?
- What will I do tomorrow?
- What’s standing in my way?
Elevator (Donald)
- Today
- Elevator mounted @ new higher height
- need to adjust angle (after testing)
- check overall height
- Elevator mounted @ new higher height
- Planning
- Test
Four Link Arms (Wells, Korn, Jane)
- Today
- New calculations + design
- Problem 1: No axle between the hand part
- need to be stiff
- Problem 2: Window motors will lock, need to be able to move arms up manually
- Look in rules to see if we can pull arms before power is cut
- Safe option: pull a pin + take the arms out
- “Mittens” that wrap around the barrel –> being laser cut
- Next step: fingers with wheel
- Need camera
- Cables for flipping mechanism cut
- Four link arms cut to length
- Planning
- ASSEMBLE!!!
- Maybe have non-motorized ver. for robot 2
- Maybe keep arms off for bag-and-tag
Electronics (Mr. Battis, Jason, Gillian, Helynna)
- Today
- Tote switches
- Need to swap Masonite + cut windows
- Need min of 1 + max of 4 (per tote)
- Tote switches
- Planning
- Need to make sure switches working (normally open, closed etc.??)
- Will be able to run robot pretty soon, Need to wire
- Sonar?
Chassis (Jason)
- Today
- ***Please cover roborio when working on robot ***
- Back bumper all bolted + finished
- Need to cut zip ties
- Planning
- Need to lock tight + clip/file bolts (before bag-and-tag)
Media (Harry, Sammy, Eun Soo)
- Today
- Go-pro still going
- Hoping to use both for chairman + promotional video
- Photoshopping handkerchief design
- Finished by today
- Go-pro still going
- Planning
- BulletedListOfPlans
Code (Kevin)
- Today
- Experimenting w/ PID
- Use for container arms?
- Not useful for elevator
- Experimenting w/ PID
- Planning
- Have it working
Contact Switches (David + helpers)
- Today
- Replaced with polycarb
- Mounting today!
- Planning
- YAY