Wednesday 02/11 Scrum Notes

  1. What did I do today?
  2. What will I do tomorrow?
  3. What’s standing in my way?

Barrel Arms (Jane, Sarah )

  • Today
    • All parts of the plastic mitten + joints gathered, drilled, + ready to assemble
    • Other hub is on the window motor
  • Planning
    • Need counter weight springs
    • Four link hung on the machine
    • We should do drawings of the 14 moving parts on the Barrel Arms
    • Cables + potentiometer (Mr. Masek)

CAD (Niles, Mr. Battis, Kevin )

  • Today
    • All parts of the plastic mitten + joints gathered, drilled, + ready to assemble
    • Other hub is on the window motor
    • Redesigned limit switch stuffs
      • ***Totes were not flat on the belt
      • Made the bump higher
    • Lifting totes up + down with NEW! hooks
  • Planning
    • Only one more chunk of 1/4″ poly carbonate (need to cut more hooks)
      • Buy some more!!
    • Swap short hats with high hats for contact switch
    • Surface switch cut out jig ready to go!

Media (Cynthia, Harry, Thayer)

  • Today
    • Saying lines; need more volunteers
  • Planning
    • Jackets will be here soon
    • Team picture looks fantabulous <3

****SECOND ROBOT?? YAH? (we need measurements and stuff)

 