Friday 02/12 Scrum Notes

  1. What did I do today?
  2. What will I do tomorrow?
  3. What’s standing in my way?

Hooks (Mr. Battis)

  • Today
    • Polycarb hooks
      • Acrylic hooks shatter, but polycarb can’t be laser cut
      • Use model hook on 1/4″ polycarb sheet
      • Mark the shape on masking tape
      • Drill 1/4″ (outside) + 1/8″ (inside) on corners
      • Then bandsaw it out
      • Then sand it
  • Planning
    • Mo’ hooks so we can put it on

Second Robot (Kate + Sammy)

  • Today
    • Threading lots of churros
    • Started on chassis (question mark?)
      • Build THIS YEAR’s chassis with THIS YEAR’s mech gearboxes (with inner rail)
      • All distances are going to be measured from the floor
    • Drawing: inner chassis plate drawn
    • Inner chassis cut out (need to cut inside)
  • Planning
    • Steps for future plan on white board

Chassis + Wiring (Mr. Roche)

  • Today
    • Camera feed can be rotatated
      • But need ring light
    • 1 Signal light needs to be wired out of the 2 we have
    • All the container/lifter/ground motors wired + ready to go

Limit Chassis Switches (David, Kevin)

  • Today
    • 4 switches mounted
      • need to wire lights for them

Elevator (Jason, Gillian)

  • Today
    • Potentiometer for the conveyor belt
  • Planning
    • Need to connect axle and sensor (problem solving with Mr. Wells)

Media (Cythia)

  • Today
    • Filmed almost all footage needed for chairman video
      • 2~3 more volunteers/clips
      • May have to reshoot, but on totally on schedule!
  • Planning
    • Shoot more!!!!

Leave a Reply