Friday 2/6 Scrum Notes

  1. What did I do today?
  2. What will I do tomorrow?
  3. What’s standing in my way?

Elevator (Donald)

  • Today
    • Elevator mounted @ new higher height
      • need to adjust angle (after testing)
      • check overall height
  • Planning
    • Test

Four Link Arms (Wells, Korn, Jane)

  • Today
    • New calculations + design
    • Problem 1: No axle between the hand part
      • need to be stiff
    • Problem 2: Window motors will lock, need to be able to move arms up manually
      • Look in rules to see if we can pull arms before power is cut
      • Safe option: pull a pin + take the arms out
    • “Mittens” that wrap around the barrel –> being laser cut
      • Next step: fingers with wheel
      • Need camera
    • Cables for flipping mechanism cut
    • Four link arms cut to length
  • Planning
    • ASSEMBLE!!!
    • Maybe have non-motorized ver. for robot 2
      • Maybe keep arms off for bag-and-tag

 

Electronics (Mr. Battis, Jason, Gillian, Helynna)

  • Today
    • Tote switches
      • Need to swap Masonite + cut windows
      • Need min of 1 + max of 4 (per tote)
  • Planning
    • Need to make sure switches working (normally open, closed etc.??)
    • Will be able to run robot pretty soon, Need to wire
    • Sonar?

 

Chassis (Jason)

  • Today
    • ***Please cover roborio when working on robot ***
    • Back bumper all bolted + finished
      • Need to cut zip ties
  • Planning
    • Need to lock tight + clip/file bolts (before bag-and-tag)

Media (Harry, Sammy, Eun Soo)

  • Today
    • Go-pro still going
      • Hoping to use both for chairman + promotional video
    • Photoshopping handkerchief design
      • Finished by today
  • Planning
    • BulletedListOfPlans

Code (Kevin)

  • Today
    • Experimenting w/ PID
      • Use for container arms?
      • Not useful for elevator
  • Planning
    • Have it working

Contact Switches (David + helpers)

  • Today
    • Replaced with polycarb
    • Mounting today!
  • Planning
    • YAY