Scrum Notes > Thursday, February 6

Notes 

  • Video
    • Cynthia worked on it! It seems to be almost done we think
  • Wiring Team
    • 2 Encoders Away from everything (except for catapult) Wired
    • Yay!
    • Second bot needs a lot of work
  • Coding
    • General code for everything (No specific numbers) Done!
    • Needs testing
  • Shooter
    • CatapultClamps designed, waiting on LaserCutter fix.
  • Second Bot
    • Putting in Mounts and Wheel protectors
    • Supports for rear window motor just about done
    • Need to start mounting El Torro

Priorities

Must

These will happen no matter what

  1. Drive
  2. Herd
  3. Score >= 6 pts
  4. Bumpers
  • Do this first week, while prototypers prototype
  • Documentation

Should

Prioritize, try to get to as many as possible

  1. Maneuverable (drive train and practice)
  • Mecanum wheels
  • Hold (hardware) a. with potential to shoot if that system comes online b. Loading (hardware) — might not even need this
  • Shoot 8’ (hardware)
  • Some aiming (software)
  • Second robot for driving practice/thinkin’

If Time Permits

Reach goals

  1. Catch
  2. Differential power settings
  3. Vision system
  4. Modular goalie arm (sub 30 lb, replace shooter at competition)

Housekeeping

  • Clean up after yourself
  • Help teammates clean up after themselves
  • We don’t leave until we scrum… we don’t scrum until the shop is clear
  • Half-finished projects go on shelves, not the floor
  • Scrap is only useful if it’s stock, stock is only useful if it’s organized

Robot Deadlines

Jan. 11: Drivetrain

Jan. 15: Mock Thrower

Jan. 22: El Toro/Vomiter

Jan. 25: Manual Catapult

Jan. 29: Gearbox

Feb. 1: Catapult Complete

Feb. 8: Finish Mechanicals

Side Projects

Things we can do before we have a design finalized…