Notes
- [NOTES AND PLANS GO HERE]
Catapult — David E.
- Bending the frame (looked great until a misbend runined it
- Going to stay later today and try to finish Back up one
Swag
- Jackets are set to get Under Armour (40$)
- Financial aid available see Mr. Battis
- T-Shrits Getting ordered
2nd Robot Team (Will)
- Finish drilling side plate
- Working on El toro for 2nd robot
- Think we could get it caught up by end of next week (3-4 days behind)
El Toro (Mr. Roche, Ryan Alipour)
Wiring
- Board is installed
- Working to wire motors
- Had to add wire spliced to motors
- Need to put on caps on ends and connect to talons
- EL TORO AND DRIVE SHOULD BE OPERATIONAL TOMORROW.
Catapult 2 (Mr. Wells)
- Working on GearBox
- Gear Box is assembled
- He needs some help with the motor mount for winch plate
- Get Catapult Pivot (Mr. Wells Tonight)
CAD —
- Finished CADiung Court
- Thinking about wanting these guys to NOT do CAD and Help with Building.
- Mr. Wells mentions strategy video and maybe these guys could watch it
- Shows a bunch of Hu-Bot
- GameHintsYouTube9out of 10 (strategy to have assists)
- If you look at and digestT-
Getting it Build Niles
- Put the to do list on Canvas (updated)
- General help
A lot of people had AMC (Math Contest)
SHOPPING
Need More Varieties of Zip Ties (ours are only the very small kind
Priorities
Must
These will happen no matter what
- Drive
- Herd
- Score >= 6 pts
- Bumpers
- Do this first week, while prototypers prototype
- Documentation
|
Should
Prioritize, try to get to as many as possible
- Maneuverable (drive train and practice)
- Mecanum wheels
- Hold (hardware) a. with potential to shoot if that system comes online b. Loading (hardware) — might not even need this
- Shoot 8’ (hardware)
- Some aiming (software)
- Second robot for driving practice/thinkin’
|
If Time Permits
Reach goals
- Catch
- Differential power settings
- Vision system
- Modular goalie arm (sub 30 lb, replace shooter at competition)
|
Housekeeping
- Clean up after yourself
- Help teammates clean up after themselves
- We don’t leave until we scrum… we don’t scrum until the shop is clear
- Half-finished projects go on shelves, not the floor
- Scrap is only useful if it’s stock, stock is only useful if it’s organized
|
Robot Deadlines
Jan. 11: Drivetrain
Jan. 15: Mock Thrower
Jan. 22: El Toro/Vomiter
Jan. 25: Manual Catapult
Jan. 29: Gearbox
Feb. 1: Catapult Complete
Feb. 8: Finish Mechanicals
Side Projects
Things we can do before we have a design finalized…
|