Thursday 1/15 Scrum Notes

  1. What did I do today?
  2. What will I do tomorrow?
  3. What’s standing in my way?

Mechanam Wheels (Thayer, Jane, Sarah, Eun Soo)

  • Today
    • Finished building
  • Planning
    • Tightening (locktight) (on hold)

“Long Arm That Grabs Containers” (Korn, Niles, Jane)

  • Today
    • Calculations are finished (for designs)
  • Planning
    • Gear box for motors
    • Grab boxes during autonomous

Frog Tongue (David & Crew)

  • Today
    • Finished
  • Planning
    • Try the tongue (Pneumatic Wheels)

Ultrasonic Sensor (Kevin)

  • Today
    • Completed calibrating
    • Limit Switch – needs wiring, easy to test
    • Extra ports cannot be installed via ‘side-port’; needs some other way
      • connect to Arduino?
  • Planning

Conveyor Belt (Gillian et al.)

  • Today
    • Working on rollers in the conveyor belt
    • need to be 3 in’ diameter to be fast enough (window motor is 75rpm)
  • Planning
    • Continue working on it

 

Pit Design (Cynthia)

  • Today
    • Changed pit design (with Ms. Levandowski)
    • PVC pipe structure with banners – to promote our team
      • lot lighter!
  • Planning
    • think about how to disassemble it

*Hotels arranged for ST. LOUIS!
**If you have pictures, upload it to Google Drive or talk with Cynthia.
***We have a visitor tomorrow!

 