Notes
- Bumpers 2.0
- Red bumper lexan pieces cut out
 
- Next meeting they will be mounted
 
 
 
- Robot 2
- Electronics/wiring board being used.
 
- Waiting on polycarb board to be lasercut.
 
 
 
- Motor Tests
- Tested everything except the “clutch” motor
 
- All El Toro Motors working
 
- Winch motor direction figured out
 
 
 
- Wheels
- Metal meeting metal – Not good
 
- Spacing incorrect
 
- Alignment incorrect
 
 
 
- El Toro Shields
- Ready to be connected
 
- Need a base plate fabricated
 
 
 
- Madeline’s Elementary school!
- We’re going there in March!
 
- Jane is in charge of talking
 
 
 
- Crash Block
- Stops catapult at the bottom
 
- Limits the catapult from hitting electronics and springs
 
 
 
- YESTERDAY:
- We shot stuff in the air and it was cool
 
- 4 Springs –> 8-10 ft. Altitude, 18 ft. Displacement (9 ft. at apex)
 
- 3 Springs –> 6-8 ft. Altitude ~14 ft. Displacement (7 ft. at apex)
 
 
 
 
Priorities
Must
These will happen no matter what 
- Drive
 
- Herd
 
- Score >= 6 pts
 
- Bumpers
 
 
- Do this first week, while prototypers prototype
 
- Documentation
 
 
 | 
Should
Prioritize, try to get to as many as possible 
- Maneuverable (drive train and practice)
 
 
- Mecanum wheels
 
- Hold (hardware) a. with potential to shoot if that system comes online b. Loading (hardware) — might not even need this
 
- Shoot 8’ (hardware)
 
- Some aiming (software)
 
- Second robot for driving practice/thinkin’
 
 
 | 
If Time Permits
Reach goals 
- Catch
 
- Differential power settings
 
- Vision system
 
- Modular goalie arm (sub 30 lb, replace shooter at competition)
 
 
 | 
 
 
Housekeeping
- Clean up after yourself
 
- Help teammates clean up after themselves
 
- We don’t leave until we scrum… we don’t scrum until the shop is clear
 
- Half-finished projects go on shelves, not the floor
 
- Scrap is only useful if it’s stock, stock is only useful if it’s organized
 
 
 | 
Robot Deadlines
Jan. 11: Drivetrain 
Jan. 15: Mock Thrower 
Jan. 22: El Toro/Vomiter 
Jan. 25: Manual Catapult 
Jan. 29: Gearbox 
Feb. 1: Catapult Complete 
Feb. 8: Finish Mechanicals 
Side Projects
Things we can do before we have a design finalized… 
 |