Notes
- Project deadlines noted on calendar in shop (and transferred into team calendar).
 
- Drive train finished by tomorrow (David, Jane)
 
- Electronics finished by tomorrow then will mov on to config the cRIO but needs drive train (Kevin)
 
- Material and plans made to build y=-|x| with height of truss and goal (Donald)
 
- test ideal width of bars that will hold bars (Alex)
 
- Shopping trip (Ken, Niles)
 
 
  
- Laser Cutter/CNC Router
- The laser cutter (and its fume extractor) are on campus and in the Leeson prep room
 
- Bob Mancuso from AET will be here on 1/22 to set the laser cutter up and train us how to use it
 
- Bob is also checking into where the CNC router is (and Mr. B has pressured him to move that calendar forward)
 
 
 
 
Priorities 
Must
These will happen no matter what 
- Drive
 
- Herd
 
- Score >= 6 pts
 
- Bumpers
 
 
- Do this first week, while prototypers prototype
 
- Documentation
 
 
 | 
Should
Prioritize, try to get to as many as possible 
- Maneuverable (drive train and practice)
 
 
- Mecanum wheels
 
- Hold (hardware) a. with potential to shoot if that system comes online b. Loading (hardware) — might not even need this
 
- Shoot 8’ (hardware)
 
- Some aiming (software)
 
- Second robot for driving practice/thinkin’
 
 
 | 
If Time Permits
Reach goals 
- Catch
 
- Differential power settings
 
- Vision system
 
- Modular goalie arm (sub 30 lb, replace shooter at competition)
 
 
 | 
 
 
Housekeeping
- Clean up after yourself
 
- Help teammates clean up after themselves
 
- We don’t leave until we scrum… we don’t scrum until the shop is clear
 
- Half-finished projects go on shelves, not the floor
 
- Scrap is only useful if it’s stock, stock is only useful if it’s organized
 
 
 | 
Robot Deadlines
Jan. 11: Drivetrain 
Jan. 15: Mock Thrower 
Jan. 18: Picker-Upper Real 
Jan. 22: Vomiter I 
Jan. 25: Vomiter II 
Jan. 29: Gearbox 
Feb. 8: Finish Mechanicals 
Current Projects
Things we can do before we have a design finalized… 
 |