Saturday 2/7 Scrum Notes

  1. What did I do today?
  2. What will I do tomorrow?
  3. What’s standing in my way?

CAN Talon (Kevin Wu)

  • Today
    • Configured CAN Talon SRX (D, E, F)
  • Planning
    • BulletedListOfPlans

Conveyor (Thayer et al)

  • Today
    • took off VHB
    • removed conveyor belt
  • Planning
    • need to change the masonite to install the belt (1/3 is made)
      • NEED POLYCARBONATE!

Hook (Kevin)

  • Today
    • remodeled the hook
  • Planning
    • was not tested yet

Limit Switch(Kevin, Niles, David)

  • Today
    • two limit switches are mounted on drivetrain (paused until belt is put back on)
    • four are mounted on the elevator
    • cases on print order

Four Link (Kate)

  • Today
    • drilled a bunch of holes
  • Planning
    • drilled a bunch of holes (8 left)

Media (Ms. Brown)

  • Today
    • Dean’s essay
    • Sarah is editing Woodie Flowers essay
    • EunSoo rewriting the Chairman’s Essay
  • Planning
    • need to make movie next week

 

 

 

 

 

Leave a Reply