Scrum Notes > Tuesday, February 11

Notes

  • Bumpers 2.0
    • Red bumper lexan pieces cut out
    • Next meeting they will be mounted
  • Robot 2
    • Electronics/wiring board being used.
    • Waiting on polycarb board to be lasercut.
  • Motor Tests
    • Tested everything except the “clutch” motor
    • All El Toro Motors working
    • Winch motor direction figured out
  • Wheels
    • Metal meeting metal – Not good
    • Spacing incorrect
    • Alignment incorrect
  • El Toro Shields
    • Ready to be connected
    • Need a base plate fabricated
  • Madeline’s Elementary school!
    • We’re going there in March!
    • Jane is in charge of talking
  • Crash Block
    • Stops catapult at the bottom
    • Limits the catapult from hitting electronics and springs
  • YESTERDAY:
    • We shot stuff in the air and it was cool
    • 4 Springs –> 8-10 ft. Altitude, 18 ft. Displacement (9 ft. at apex)
    • 3 Springs –> 6-8 ft. Altitude ~14 ft. Displacement (7 ft. at apex)

Priorities

Must

These will happen no matter what

  1. Drive
  2. Herd
  3. Score >= 6 pts
  4. Bumpers
  • Do this first week, while prototypers prototype
  • Documentation

Should

Prioritize, try to get to as many as possible

  1. Maneuverable (drive train and practice)
  • Mecanum wheels
  • Hold (hardware) a. with potential to shoot if that system comes online b. Loading (hardware) — might not even need this
  • Shoot 8’ (hardware)
  • Some aiming (software)
  • Second robot for driving practice/thinkin’

If Time Permits

Reach goals

  1. Catch
  2. Differential power settings
  3. Vision system
  4. Modular goalie arm (sub 30 lb, replace shooter at competition)

Housekeeping

  • Clean up after yourself
  • Help teammates clean up after themselves
  • We don’t leave until we scrum… we don’t scrum until the shop is clear
  • Half-finished projects go on shelves, not the floor
  • Scrap is only useful if it’s stock, stock is only useful if it’s organized

Robot Deadlines

Jan. 11: Drivetrain

Jan. 15: Mock Thrower

Jan. 22: El Toro/Vomiter

Jan. 25: Manual Catapult

Jan. 29: Gearbox

Feb. 1: Catapult Complete

Feb. 8: Finish Mechanicals

Side Projects

Things we can do before we have a design finalized…