Wednesday 3/4 Scrum Notes

  1. What did I do today?
  2. What will I do tomorrow?
  3. What’s standing in my way?

Hooks (David and people)

  • Today
    • New hook design
      • adapted layout of tote onto aluminum square tube
      • triangle cut out shape
      • good droop angle
      • maybe too long?
      • need smaller bolts *** find them
    • Bolts hook design
      • cut + bent bolts with washers on polycarb
      • safety issue? being addressed
    • Washer polycarb design
      • further out
    • some work on pho-rollers
  • Planning
    • test out on the real bot + VHB

Auto (Kevin)

  • Today
    • works perfectly <3
    • using sonor sensors
    • working on straight strafe (like 1519 did)
  • Planning
    • run on real robot with hooks

Media (Eun Soo, Cynthia, Sarah)

  • Today
    • got materials w/ Ms. Brown today
    • 3566 on poster board to keep seats in stand
    • eyeliners + face paint for competition cheering
    • shark mascot costume
  • Planning
    • BulletedListOfPlans

Unbagging Schedule:

Wednesday: Finalize + choose hook design (if we’re ready: unbagging @ 7~9?)

Thursday: Test

Friday: pack during co-curricular block leave @ 4pm

Leave a Reply